NGE-TFT provided design services, and on-site engineering support and construction management to the construction of a 1,000-ft long sheet pile dock wall at Trident Seafood’s processing facility located in Akutan, Alaska. Services provided included a geotechnical evaluation of the dock wall alignment, sheet pile wall and tieback anchor design, and backfill recommendations. A borrow source evaluation and volume determination was also conducted in association with the dock design which evaluated the suitability of a nearby quarry to produce backfill material for the proposed dock expansion.
NGE-TFT provided design services and on-site engineering support to repair a failed sheet pile bulkhead wall at Trident Seafood’s processing facility located in Akutan, Alaska. Services provided included sheet pile wall design, including drilled and grouted tieback anchors and crane and bollard foundations.
Geotechnical evaluation performed to monitor and
assess a vibro-compaction effort for densification of earthen fill dike within
the guidelines set by the Project Engineer.
Work included SPT sampling before and after compaction effort and SPT
hammer efficiency determination utilizing SPT analyzer equipment.